Located in Queensland’s Moreton Bay region, Strathpine Gateway is a $50 million mixed-use development that signals a new era of growth and vitality for the area.
The 8,530 sqm complex is an all-in-one entertainment, retail and dining destination comprising several commercial buildings, including the Country Club Hotel, a retail precinct, and an indoor sporting and recreation centre.
For a project of this scale, structural integrity was critical. Fielders SlimDek 210®, an efficient steel formwork system designed for long spans and lower floor depths, met this essential requirement, while its broader commercial value compared with alternative products made it the primary structural solution for the project.
Over 12,400 sqm of SlimDek 210® was used throughout the development, primarily across the carpark and hotel mezzanine. The permanent formwork product was key to achieving long unpropped spans, particularly for the suspended ground-level carpark, while helping to reduce construction time and overall costs.
Proving the SlimDek 210® advantage
It was critical to minimise risk of additional rework to ensure the project was delivered on time. Both builder and engineer sought a steel formwork approach that could work with the tolerances across the different structural zones, avoiding the need for remedial works and coordination issues between follow-on trades.
As the Design Solutions Group (DSG) team deepened its understanding of the project's construction requirements, it became clear that using SlimDek 210® as the broader formwork solution could significantly improve return on investment (ROI) in both time and cost.
The Lysaght DSG team, working as a local agent of Fielders in Queensland, was recognised for its trusted assistance throughout the project. A mixed-use development of this scale is inherently complex, and all stakeholders appreciated the time and effort the local team invested in maximising formwork benefits.
Read the full article at: https://fielders.com.au/inspiration/blog/fielders-slimdek-210-maximises-project-value-strathpine-gateway